Annex X Comparison of phased approach with Single Scheme
Phase one (original scheme) |
Single scheme for contiguous footstreets scheme |
Phase 2 Phase Further phase to protect the rest of the contiguous footstreets, after phase one installation |
|||
Location |
Measures |
Location |
Measures |
Location |
Measures |
Parliament Street |
Sliding bollard system controlled access/egress 23 static bollards |
Parliament Street |
Sliding bollard system controlled access/egress 23 static bollards |
|
|
Spurriergate |
Sliding bollard system controlled access 8 static bollards |
Spurriergate |
Sliding bollard system controlled access 8 static bollards |
|
|
Coney Street |
Sliding bollard system controlled egress 2 static bollards |
Lendal |
Sliding bollard system controlled egress 5 static bollards |
Lendal |
Sliding bollard system controlled egress 5 static bollards |
Davygate |
Sliding bollard system controlled access 4 static bollards |
Blake Street |
Sliding bollard system controlled access 2 static bollards |
Blake Street |
Sliding bollard system controlled access 2 static bollards |
St Sampson’s Square |
Sliding bollard system controlled access/egress Sliding bollard system controlled egress 14 static bollards |
Goodramgate |
Sliding bollard system controlled access 2 static bollards |
Goodramgate |
Sliding bollard system controlled access 2 static bollards |
|
|
Colliergate |
Sliding bollard system controlled egress 5 static bollards |
Colliergate |
Sliding bollard system controlled egress 5 static bollards |
|
|
High Petergate |
Sliding bollard system controlled access 3 static bollards |
High Petergate |
Sliding bollard system controlled access 3 static bollards |
|
|
The Shambles |
Sliding bollard system controlled access or similar 2 static bollards |
The Shambles |
Sliding bollard system controlled access or similar 2 static bollards |
Jubbergate |
5 static bollards 2 lift out bollards |
St Andrewgate |
Replace 5 bollards |
St Andrewgate |
Replace 5 bollards |
|
|
Minster Gates |
Replace 4 bollards |
Minster Gates |
Replace 4 bollards |
Finkle Street |
1 static bollard |
|
|
|
|
Coppergate to Ousegate path |
1 static bollard |
Coppergate to Ousegate path |
1 static bollard |
|
|
Total |
2 Sliding systems - large 4 Sliding systems - medium 2 lift out bollards 58 static bollards |
|
2 Sliding systems - large 5 Sliding systems - medium 1 Sliding systems – small, or similar 60 static bollards
|
|
Additional: 5 Sliding systems - medium 1 Sliding systems – small, or similar 28 static bollards Total: 2 Sliding systems - large 9 Sliding systems – medium 1 sliding system - small 86 static bollards
|
Estimated cost |
Phase 1 £1.7M |
|
£1.7M Total £1.7M |
|
Additional £1.6M on top of phase 1 Total £3.3M |